Cleared bench Building the cleared team for the programs coming down the pipe. Hold a clearance? Get on the bench before the work drops. Apply / join the bench →
SDVOSB · VetCert Verified UEI H323F8L44MV5 CAGE 01R17 NAICS 541690 SAM.gov Active ICD 705 · site selection to accreditation
ICD 705 · SCIF / SAPF · FCL · cleared-principal delivery

Keep your secure facility moving—from first site decision to accreditation.

Bedrock helps government teams and prime contractors prevent costly redesign, recover troubled SCIF programs, and build a submission-ready accreditation record. One cleared, accountable advisory team works the handoffs between design, construction, security, and the Accrediting Official.

Fixed scope from $5,500 · no controlled information requested · response inside one business day
Government ownersIndependent lifecycle oversight, readiness, and defensible accreditation evidence.
Prime contractors & A/E/C teamsCleared-facility depth at the design, construction, and security seams.
Cleared companiesFCL setup, FSO discipline, inspection preparation, and program recovery.
BEDROCK BEDROCK SECURITY ADVISORY GROUP
The clearest first engagement

Find the facility risk before it becomes redesign, delay, or a failed review.

FAULTLINE 705 is Bedrock's fixed-scope entry point for teams facing inspection pressure, documentation drift, re-accreditation, or a secure-facility decision that cannot afford ambiguity. You receive named findings, a prioritized corrective path, and a cleared principal who owns the answer.

Starts at $5,500Fixed scope and defined deliverables.
Evidence, not opinionTraceable findings and decision-ready next steps.
Cleared principal deliveryNo anonymous handoff; one accountable owner.
Safe first contactNo classified, CUI, or sensitive facility detail required.
What Bedrock does

The ICD 705 lifecycle, from empty ground to accredited and sustained.

Scroll the facility as Bedrock builds it, stage by stage. Pre-design and site selection through accreditation, then pre-FCL, FCL, and FSO continuity. Many programs do not fail on the concrete. They fail in the handoffs, where security arrives late or a requirement is read two ways. Schematic by design, no controlled detail.

ICD 705 LIFECYCLE · STAGE 01 / 06
STAGE 01

Site selection

Before a wall exists, the wrong location bakes in cost and risk. Bedrock reads the site against ICD 705 from day zero: standoff, adjacencies, structure, RF exposure.

Deliverable: site suitability read
ICD 705 LIFECYCLE · 6 STAGES

Where SCIFs actually fail

Not in the middle of a build. In the handoffs between stages. Bedrock works every seam, pre-design through operations.

Stage 01
Site selection

Before a wall exists, the wrong location bakes in cost and risk. Bedrock reads the site against ICD 705 from day zero: standoff, adjacencies, structure, RF exposure.

Stage 02
Design and CSP

The footprint and security zones are drawn to spec. The Construction Security Plan and Fixed Facility Checklist take shape before the first contractor mobilizes.

Stage 03
Construction security

Walls rise with acoustic and structural protection. Transport is fiber and protected distribution by default, with RED and BLACK separation where copper is used.

Stage 04
TEMPEST and RF

The shielded envelope and inspectable space boundary are established. Zone determination and equipment placement are documented to survive review.

Stage 05
Accreditation

Access control and intrusion detection are validated, and the full submission package is assembled. The deliverable is your submission. The determination is the agency's.

Stage 06
Pre-FCL, FCL, and FSO continuity

Accreditation is a start line, not a finish. Bedrock carries the program on one evidence trail that keeps it compliant between inspections.

01 · AUTHORITY

Full-lifecycle facility command

ICD 705, SCIF/SAPF, FCL, NISPOM, RMF overlay, owned end to end, not handed off at each boundary. The whole lifecycle is the practice.

02 · EVIDENCE

Provenance, not opinion

Deterministic scoring and a documented evidence trail behind every recommendation, signed by a cleared principal.

03 · ACCOUNTABILITY

Cleared principals on the line

Cleared principals deliver every engagement personally. No offshore, no LLM-generated deliverables, no anonymous bench. A name and a phone number own the outcome.

The record behind it

Relevant operating depth, stated without inflated company claims.

65+
SCIFs and SAPFs supported across principal careers (aggregate)
$400M+
Secure-asset responsibility, principal career aggregate
4
Practice areas: ICD 705 lifecycle, FCL, industrial security, inspection readiness
1 day
Response window · 0700-1900 ET
Metrics reflect principal prior-employment experience supporting classified facility, security, and mission programs. They are provided to describe relevant operator experience and are not presented as Bedrock Security Advisory Group LLC company past performance.
Where to start

One primary entry point, with two specialist paths.

Start with an instrument, not a contact form

Score your SCIF drift in five minutes.

Eight questions, a live risk index, the specific gaps driving it, and the sprint that closes them, handed straight to a cleared principal. It never asks for controlled or classified information.

Drift indexlive
72
Band C · Critical. Pre-Inspection Acceleration Sprint recommended. Five named gaps, one fixed-scope path.
Questions buyers ask

Straight answers on ICD 705, cost, and the lifecycle.

Who does independent ICD 705 SCIF accreditation readiness for SDVOSBs?

Bedrock Security Advisory Group, a Service-Disabled Veteran-Owned Small Business, runs the full ICD 705 lifecycle from site selection through the accreditation package, plus Facility Clearance and Facility Security Officer support. Every engagement is delivered by a cleared principal.

How much does a SCIF readiness sprint cost?

FAULTLINE 705 fixed-scope sprints start at $5,500 for a Drift Assessment, $7,500 for a Pre-Inspection Acceleration, and $8,500 for a Re-Accreditation Readiness Sprint. Larger lifecycle and FCL engagements typically run $25,000 to $100,000 or more, confirmed after a discovery review.

What does the ICD 705 accreditation lifecycle include?

Site selection, design and the Construction Security Plan, construction security with fiber and protected distribution, TEMPEST and acoustic protection, the submission-ready accreditation package, then pre-FCL readiness, Facility Clearance setup, and ongoing FSO discipline.

Can Bedrock help before a DCSA inspection?

Yes. The Pre-Inspection Acceleration Sprint runs a mock review and a remediation plan before the real inspection, and the free interactive SCIF drift self-assessment scores your risk and names your gaps in minutes.

Does Bedrock do FCL and FSO work?

Yes. Bedrock supports pre-FCL readiness, Facility Clearance setup under 32 CFR Part 117, and ongoing Facility Security Officer discipline, carried on one continuous evidence trail.