METHODOLOGY · 9-PHASE PLAYBOOK
What an FCL Setup engagement actually looks like.
Nine phases, in order. Each phase has a defined entry condition, a defined deliverable, and a cleared principal accountable for the artifact. Phase scope is calibrated to the customer's situation at kickoff.
01
Sponsor Verification
Confirm the prime or government sponsor relationship is real, current, and supports DCSA sponsorship submission.
02
KMP & FOCI Triage
Identify Key Management Personnel. Surface foreign ownership, control, or influence factors before submission.
03
Document Package
Build DD-441, SF-328, KMP designations, FSO designation, and supporting packets to DCSA-accepted format.
04
KMP Clearance Initiations
Initiate personnel clearances for the cleared KMP set. Track to investigation stage. Coordinate with the FSO.
05
Security Program Stand-Up
Establish NISPOM-compliant policies, procedures, insider-threat program, and required postings.
06
FSO Preparation
Train and equip the customer-designated FSO. Run through operational scenarios. Hand off operating tools.
07
ISR Liaison
Coordinate with the assigned DCSA Industrial Security Representative through submission and validation.
08
Pre-FCL Inspection Readiness
Run a mock inspection. Surface findings. Remediate before the DCSA review. Document the evidence file.
09
DCSA Issuance & Handoff
Receive the FCL. Transfer operating control to the designated FSO. Close the engagement with a written posture brief.
SCOPE TIERS · CHOOSE THE ONE THAT FITS YOUR SITUATION
Three tiers. One playbook.
Every tier runs the same 9-phase playbook. The tiers differ in complexity, in the regulatory pathway, and in the cleared principal hours required. The right tier is decided on the scoping call, not before.
TIER 1
Standard FCL Setup
Domestic-owned, single-facility, single-clearance-level cleared shop. The cleanest path through DCSA sponsorship.
- Sponsor verification through DCSA issuance
- KMP clearance initiation
- Security program stand-up
- FSO preparation and handoff
TIER 2
FCL Setup with FOCI Mitigation
Standard scope plus foreign ownership, control, or influence triage and mitigation. For shops with FOCI factors that must be addressed before issuance.
- Everything in Tier 1
- FOCI triage and analysis
- Mitigation instrument selection
- DCSA negotiation support
TIER 3
TS / TS-SCI FCL Setup
Top Secret and TS / TS-SCI facility clearance support. CSA coordination, classification-handling alignment, and pre-accreditation posture for higher classification handling.
- Everything in Tier 1 (plus FOCI if applicable)
- CSA coordination
- SAP and SAR pathway alignment
- Pre-accreditation posture
DOCTRINE · BOUNDARY
What we refuse.
An advisory firm that will not say what it does not do is selling you anxiety. Three things stay out of FCL Setup scope on every engagement, on purpose.
01
We do not become your permanent FSO. We prepare the FSO you designate and hand off the operating posture.
02
We do not certify compliance. DCSA does. We get your evidence in order and your posture defensible.
03
We do not outsource the work. Cleared Bedrock principals own every phase. No subcontracted delivery.
QUARTERLY CLEARED CONTRACTOR RISK BRIEF
Field notes from inside the work. Quarterly. No filler.
Short, practical field notes on FCL readiness, DCSA inspection risk, SCIF / SAPF execution, sources sought signals, and cleared-business growth. Written for operators, not tourists. Four issues a year. Unsubscribe with one click.